Toronto Hydro-Electric System Limited - Environmental Compliance Approval (sewage)

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Environmental Compliance Approval (sewage)

Numéro du REO
019-1560
Numéro de référence du ministère
2922-BM4K9D
Type d'avis
Instrument
Loi
Environmental Protection Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Proposition Mis à jour
Proposition affichée
Période de consultation
Du 14 avril 2020 au 29 mai 2020 (45 jours) Fermé
Dernière mise à jour

Il n’existe aucune obligation d’afficher cet avis sur le Registre environnemental de l’Ontario, mais nous voulons connaître votre opinion. Soumettez un commentaire et donnez-nous votre avis. Pour en savoir davantage sur le processus de consultation et les types d’avis publiés sur le registre.

Update Announcement

A decision for this proposal has been published as a Bulletin under ERO 019-2918 on February 2, 2021.

Cette consultation a eu lieu :

du 14 avril 2020
au 29 mai 2020

Résumé de la proposition

This proposal is for a new Environmental Compliance Approval for upgrades to a transformer and oil containment system to service 510 Bellamy Road North, Toronto, Ontario.

Détails de l'emplacement

Adresse du site

510 Bellamy Road North
Toronto, ON
M1H 1G3
Canada

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

Toronto Hydro-Electric System Limited
715 Milner Avenue
Toronto, ON
M1B 3C3
Canada

Pourquoi une consultation n’est pas nécessaire

On April 1, 2020, the Ontario Government made a temporary regulation to respond to the COVID-19 outbreak. Ontario Regulation 115/20 exempts all proposals for policies, acts, regulations and instruments from posting requirements under the EBR until 30 days after the declared emergency is terminated.

Détails de la proposition

This proposal is for a new Environmental Compliance Approval for establishment of sewage works for the collection, transmission, treatment and disposal of stormwater at the Bellamy-Lawrence Station, located at 510 Bellamy Road North, in the City of Toronto, on behalf of Toronto Hydro-Electric System Limited.

The station houses one (1) distribution transformer. The proposed works consist of an individual passive oil containment pit for the transformer having a minimum capacity of approximately 8,800 litres.

The pit liners will be comprised of passive materials with containment system. The system allows rainwater to filter through the liner materials but becomes impermeable when in contact with oil. Given the soil condition at the site, the sub drainage system will be provided below the containment system to prevent water from accumulating in the pit and potentially reducing the available storage capacity.

This drainage system was connected into an on-site detention pit where the rainwater will infiltrate into the subsoil strata.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Client Services and Permissions Branch
Address

135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada

Office phone number
Toronto District Office
Address

5775 Yonge Street
Floor 9
Toronto, ON
M2M 4J1
Canada

Office phone number

Commentaire

La consultation est maintenant terminée.

La période de consultation a eu lieu du 14 avril 2020