Amico Infrastructures Inc. as general partners for and on behalf of West Corridor Constructors General Partnership - Permit to take water

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Permit to take water

Numéro du REO
019-1353
Numéro de référence du ministère
5701-BLAR2K
Type d'avis
Instrument
Loi
Ontario Water Resources Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Décision
Décision publiée
Période de consultation
Du 21 février 2020 au 22 mars 2020 (30 jours) Fermé
Dernière mise à jour

Cette consultation a eu lieu :

du 21 février 2020
au 22 mars 2020

Résumé de la décision

Permit to Take Water No. 8215-BPZ4DY was issued on May 28, 2020 for construction dewatering purposes related to a proposed expansion of Highway 401 on sites located in the Town of Milton, Town of Halton Hills and the City of Mississauga, in the Region of Halton and Peel. The permit expires on May 31, 2024.

Détails de l'emplacement

Adresse du site

Lots 2 and 3, Concession 3, Town of Milton
ON
Canada

Détails de l'emplacement du site

Lot 15, Concessions 5, 7, 8, 9 and 10, Town of Halton Hills

Lot 9, Concession: 4, City of Mississauga

Lots 10 and 11, Concession 5, City of Mississauga

Lot 14, Concessions 9, 10 and 11, City of Mississauga

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

Amico Infrastructures Inc. as general partners for and on behalf of West Corridor Constructors General Partnership
20 Carlson Court
Suite 105
Toronto, ON
M9W 7K6
Canada

Aecon Infrastructure Management Inc. as general partners for and on behalf of West Corridor Constructors General Partnership
20 Carlson Court, Suite 105
Toronto, ON
M9W 7K6
Canada

Parsons Inc. as general partners for and on behalf of West Corridor Constructors General Partnership
20 Carlson Court, Suite 105
Toronto, ON
M9W 7K6
Canada

Détails de la décision

Permit to Take Water No. 8215-BPZ4DY was issued on May 28, 2020 for construction dewatering purposes related to a proposed expansion of Highway 401 on sites located in the Town of Milton, Town of Halton Hills and the City of Mississauga, in the Region of Halton and Peel. The permit expires on May 31, 2024.

Water will be taken from 18 wells. Details of the water taking are as follows:

Permit type - new (Category 3)

Source of water: drilled well WCC-1

  • maximum rate (litres per minute): 21.00
  • maximum number of hours of taking per day: 24
  • maximum volume (litres) per day: 30,000.00
  • maximum number of days of taking in a year: 365

Source of water: drilled well 10X-0368/C0

  • maximum rate (litres per minute): 20.00
  • maximum number of hours of taking per day: 24
  • maximum volume (litres) per day: 30,000.00
  • maximum number of days of taking in a year: 365

Source of water: drilled well 10X-0591/C0

  • maximum rate (litres per minute): 230.00
  • maximum number of hours of taking per day: 24
  • maximum volume (litres) per day: 330,000.00
  • maximum number of days of taking in a year: 365

Source of water: drilled well 10X-0077/B0

  • maximum rate (litres per minute): 502.00
  • maximum number of hours of taking per day: 24
  • maximum volume (litres) per day: 720,000.00
  • maximum number of days of taking in a year: 365

Source of water: drilled well 10X-0078/B1&B2

  • maximum rate (litres per minute): 92.00
  • maximum number of hours of taking per day: 24
  • maximum volume (litres) per day: 130,000.00
  • maximum number of days of taking in a year: 365

Source of water: drilled well 10X-0081/C0

  • maximum rate (litres per minute): 205.00
  • maximum number of hours of taking per day: 24
  • maximum volume (litres) per day: 300,000.00
  • maximum number of days of taking in a year: 365

Source of water: drilled well 10X-0726/W0

  • maximum rate (litres per minute): 35.00
  • maximum number of hours of taking per day: 24
  • maximum volume (litres) per day: 50,000.00
  • maximum number of days of taking in a year: 365

Source of water: drilled well 10X-0539/W0

  • maximum rate (litres per minute): 19.00
  • maximum number of hours of taking per day: 24
  • maximum volume (litres) per day: 30,000.00
  • maximum number of days of taking in a year: 365

Source of water: drilled well 10X-0540/W0

  • maximum rate (litres per minute): 18.00
  • maximum number of hours of taking per day: 24
  • maximum volume (litres) per day: 30,000.00
  • maximum number of days of taking in a year: 365

Source of water: drilled well 10X-0542/B0&W0

  • maximum rate (litres per minute): 124.00
  • maximum number of hours of taking per day: 24
  • maximum volume (litres) per day: 180,000.00
  • maximum number of days of taking in a year: 365

Source of water: drilled well 10X-0593/C0

  • maximum rate (litres per minute): 62.00
  • maximum number of hours of taking per day: 24
  • maximum volume (litres) per day: 90,000.00
  • maximum number of days of taking in a year: 365

Source of water: drilled well 10X-0524/W0

  • maximum rate (litres per minute): 15.00
  • maximum number of hours of taking per day: 24
  • maximum volume (litres) per day: 20,000.00
  • maximum number of days of taking in a year: 365

Source of water: drilled well 10X-0600/C0

  • maximum rate (litres per minute): 120.00
  • maximum number of hours of taking per day: 24
  • maximum volume (litres) per day: 170,000.00
  • maximum number of days of taking in a year: 365

Source of water: drilled well 10X-0098/B1&B2&W0

  • maximum rate (litres per minute): 35.00
  • maximum number of hours of taking per day: 24
  • maximum volume (litres) per day: 40,000.00
  • maximum number of days of taking in a year: 365

Source of water: drilled well 24X-0124/B1, B2, B3&B4

  • maximum rate (litres per minute): 210.00
  • maximum number of hours of taking per day: 24
  • maximum volume (litres) per day: 300,000.00
  • maximum number of days of taking in a year: 365

Source of water: drilled well 24X-0253/C0

  • maximum rate (litres per minute): 124.00
  • maximum number of hours of taking per day: 24
  • maximum volume (litres) per day: 180,000.00
  • Maximum Number of Days of Taking in a Year: 365

Source of water: drilled well 24X-0127/B0

  • maximum rate (litres per minute): 70.00
  • maximum number of hours of taking per day: 24
  • maximum volume (litre) per day: 100,000.00
  • maximum number of days of taking in a year: 365

Source of water: drilled well 24X-0128/B1,B2,B3&B4

  • maximum rate (litres per minute): 104.00
  • maximum number of hours of taking per day: 24
  • maximum volume (litres) per day: 580,000.00
  • maximum number of days of taking in a year: 365

Request a copy of the permit.

Commentaires reçus

Par l'entremise du registre

1

Par courriel

0

Par la poste

0
Consulter les commentaires soumis par l'entremise du registre

Effets de la consultation

A comment was received with concerns related to the discharge to the City of Mississauga's storm sewer system.

Response:

A note has been included in the permit, advising that the permit does not authorize the permit holder to discharge the pumped water to the municipal storm and/or sanitary sewer system. The permit holder must obtain a discharge permit from the municipality prior to the commencement of any discharge of the pumped water into the municipal storm and/or sanitary sewer system.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Drinking Water and Environmental Compliance Division - Central Region Office
Address

5775 Yonge Street
Floor 8
Toronto, ON
M2M 4J1
Canada

Office phone number

How to Appeal

Cet avis de décision peut être porté en appel. Vous avez jusqu’à 15 jours à partir du 10 mars 2021 pour entamer le processus d’appel.

Veuillez lire les renseignements suivants attentivement pour en savoir plus sur le processus d’appel.

Comment interjeter appelClick to Expand Accordion

For instrument decisions published on or after June 1, 2021, please refer to the updated instructions for information on how to appeal a decision.

Appeal process for decisions published before June 1, 2021

If you’re an Ontario resident, you can start the process to appeal this instrument decision.

First, you’ll need to seek leave (i.e. get permission) from the relevant appellate body to appeal the decision.

If the appellate body grants leave, the appeal itself will follow.

Seek leave to appeal

To seek leave to appeal, you need to do these three things:

  1. prepare your application
  2. provide notice to the minister
  3. mail your application to three parties

1. Prepare your application

You’ll need to prepare an application. You may wish to include the following things in your application:

  1. A document that includes:
    • your name, phone number, fax number (if any), and/or email address
    • the ERO number and ministry reference number (located on this page)
    • a statement about whether you are a resident in Ontario
    • your interest in the decision, and any facts you want taken into account in deciding whether you have an interest in the decision
    • the parts of the instrument that you’re challenging
    • whether the decision could result in significant harm to the environment
    • the reason(s) why you believe that no reasonable person – having regard to the relevant law and to any government policies developed to guide decisions of that kind – could have made the decision
    • the grounds (facts) you’ll be using to appeal
    • the outcome you’d like to see
  2. A copy of the instrument (approval, permit, order) that you you are seeking leave to appeal. You’ll find this in the decision notice on the Environmental Registry
  3. Copies of all supporting documents, facts and evidence that you’ll be using to appeal
What is considered

The appeal body will consider the following two questions in deciding whether to grant you leave to appeal:

  1. is there is good reason to believe that no reasonable person, with respect to the relevant law and to any government policies developed to guide decisions of that kind, could have made the decision?
  2. could the decision you wish to appeal result in significant harm to the environment?

2. Provide your notice

You’ll need to provide notice to the Minister of the Environment, Conservation and Parks that you’re seeking leave to appeal.

In your notice, please include a brief description of the:

  • decision that you wish to appeal
  • grounds for granting leave to appeal

You can provide notice by email at minister.mecp@ontario.ca or by mail at:

College Park 5th Floor, 777 Bay St.
Toronto, ON 
M7A 2J3

3. Mail your application

You’ll need to mail your application that you prepared in step #1 to each of these three parties:

  • appellate body
  • issuing authority (the ministry official who issued the instrument)
  • proponent (the company or individual to whom the instrument was issued)

Autorité compétente
Ellen Klupfel
Supervisor (Acting)

Central Region
119 King St W
Floor 12
Hamilton, ON
L8P 4Y7
Canada

437-216-5233

Proponent(s)

Amico Infrastructures Inc. as general partners for and on behalf of West Corridor Constructors General Partnership
20 Carlson Court
Suite 105
Toronto, ON
M9W 7K6
Canada

Aecon Infrastructure Management Inc. as general partners for and on behalf of West Corridor Constructors General Partnership
20 Carlson Court, Suite 105
Toronto, ON
M9W 7K6
Canada

Parsons Inc. as general partners for and on behalf of West Corridor Constructors General Partnership
20 Carlson Court, Suite 105
Toronto, ON
M9W 7K6
Canada


Organe d’appel

Environmental Review Tribunal
Attention: The Secretary
655 Bay Street
Floor 15
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca

About the Environmental Review Tribunal


Inclure les éléments suivants:

Numéro du REO
019-1353
Numéro de référence du ministère
5701-BLAR2K

Il ne s'agit pas d'un avis juridique. Veuillez vous reporter à la Charte des droits environnementaux de 1993 pour connaître les exigences exactes prévues par la loi. Consultez un avocat si vous avez besoin d'aide avec le processus d'appel.

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis

Proposition initiale

Numéro du REO
019-1353
Numéro de référence du ministère
5701-BLAR2K
Type d'avis
Instrument
Loi
Ontario Water Resources Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Proposition affichée

Période de consultation

21 février 2020 - 22 mars 2020 (30 days)

Détails de la proposition

This proposal is for a new permit to take water application for construction dewatering needs related to a proposed expansion of Highway 401 on a sites located in the Town of Milton, Town of Halton Hills and the City of Mississauga, in the Region of Halton and Peel. Water will be taken from eighteen (18) wells. Details of Water Taking are as follows:

Permit type - new (Category 3)

Source of water: drilled well WCC-1

  • purpose of water taking: construction dewatering
  • maximum rate (litres per minute): 21.00
  • maximum number of hours of taking per day: 24
  • maximum volume (litres) per day: 30,000.00
  • maximum number of days of taking in a year: 365
  • earliest calendar date of taking (mm/dd): 02/03
  • latest calendar date of taking (mm/dd): 02/02
  • period of water taking: 4 years

Source of water: drilled well 10X-0368/C0

  • purpose of water taking: construction dewatering
  • maximum rate (litres per minute): 20.00
  • maximum number of hours of taking per day: 24
  • maximum volume (litres) per day: 30,000.00
  • maximum number of days of taking in a year: 365
  • earliest calendar date of taking (mm/dd): 02/03
  • latest calendar date of taking (mm/dd): 02/02
  • period of water taking: 4 years

Source of water: drilled well 10X-0591/C0

  • purpose of water taking: construction dewatering
  • maximum rate (litres per minute): 230.00
  • maximum number of hours of taking per day: 24
  • maximum volume (Lltres) per day: 330,000.00
  • maximum number of days of taking in a year: 365
  • earliest calendar date of taking (mm/dd): 02/03
  • latest calendar date of taking (mm/dd): 02/02
  • period of water taking: 4 years

Source of water: drilled well 10X-0077/B0

  • purpose of water taking: construction dewatering
  • maximum rate (litres per minute): 502.00
  • maximum number of hours of taking per day: 24
  • maximum volume (litres) per day: 720,000.00
  • maximum number of days of taking in a year: 365
  • earliest calendar date of taking (mm/dd): 02/03
  • latest calendar date of taking (mm/dd): 02/02
  • period of water taking: 4 years

Source of water: drilled well 10X-0078/B1&B2

  • purpose of water taking: construction dewatering
  • maximum rate (litres per minute): 92.00
  • maximum number of hours of taking per day: 24
  • maximum volume (litres) per day: 130,000.00
  • maximum number of days of taking in a year: 365
  • earliest calendar date of taking (mm/dd): 02/03
  • latest calendar date of taking (mm/dd): 02/02
  • period of water taking: 4 years

Source of water: drilled well 10X-0081/C0

  • purpose of water taking: construction dewatering
  • maximum rate (litres per minute): 205.00
  • maximum number of hours of taking per day: 24
  • maximum volume (litres) per day: 300,000.00
  • maximum number of days of taking in a year: 365
  • earliest calendar date of taking (mm/dd): 02/03
  • latest calendar date of taking (mm/dd): 02/02
  • period of water taking: 4 years

Source of water: drilled well 10X-0726/W0

  • purpose of water taking: construction dewatering
  • maximum rate (litres per minute): 35.00
  • maximum number of hours of taking per day: 24
  • maximum volume (litres) per day: 50,000.00
  • maximum number of days of taking in a year: 365
  • earliest calendar date of taking (mm/dd): 02/03
  • latest calendar date of taking (mm/dd): 02/02
  • period of water taking: 4 years

Source of water: drilled well 10X-0539/W0

  • purpose of water taking: construction dewatering
  • maximum rate (litres per minute): 19.00
  • maximum number of hours of taking per day: 24
  • maximum volume (litres) per day: 30,000.00
  • maximum number of days of taking in a year: 365
  • earliest calendar date of taking (mm/dd): 02/03
  • latest calendar date of taking (mm/dd): 02/02
  • period of water taking: 4 years

Source of water: drilled well 10X-0540/W0

  • purpose of water taking: construction dewatering
  • maximum rate (litres per minute): 18.00
  • maximum number of hours of taking per day: 24
  • maximum volume (litres) per day: 30,000.00
  • maximum number of days of taking in a year: 365
  • earliest calendar date of taking (mm/dd): 02/03
  • latest calendar date of taking (mm/dd): 02/02
  • period of water taking: 4 years

Source of water: drilled well 10X-0542/B0&W0

  • purpose of water taking: construction dewatering
  • maximum rate (litres per minute): 124.00
  • maximum number of hours of taking per day: 24
  • maximum volume (litres) per day: 180,000.00
  • maximum number of days of taking in a year: 365
  • earliest calendar date of taking (mm/dd): 02/03
  • latest calendar date of taking (mm/dd): 02/02
  • period of water taking: 4 years

Source of water: drilled well 10X-0593/C0

  • purpose of water taking: construction dewatering
  • maximum rate (litres per minute): 62.00
  • maximum number of hours of taking per day: 24
  • maximum volume (litres) per day: 90,000.00
  • maximum number of days of taking in a year: 365
  • earliest calendar date of taking (mm/dd): 02/03
  • latest calendar date of taking (mm/dd): 02/02
  • period of water taking: 4 years

Source of water: drilled well 10X-0524/W0

  • purpose of water taking: construction dewatering
  • maximum rate (litres per minute): 15.00
  • maximum number of hours of taking per day: 24
  • maximum volume (litres) per day: 20,000.00
  • maximum number of days of taking in a year: 365
  • earliest calendar date of taking (mm/dd): 02/03
  • latest calendar date of taking (mm/dd): 02/02
  • period of water taking: 4 years

Source of water: drilled well 10X-0600/C0

  • purpose of water taking: construction dewatering
  • maximum rate (litres per minute): 120.00
  • maximum number of hours of taking per day: 24
  • maximum volume (litres) per day: 170,000.00
  • maximum number of days of taking in a year: 365
  • earliest calendar date of taking (mm/dd): 02/03
  • latest calendar date of taking (mm/dd): 02/02
  • period of water taking: 4 years

Source of water: drilled well 10X-0098/B1&B2&W0

  • purpose of water taking: construction dewatering
  • maximum rate (litres per minute): 35.00
  • maximum number of hours of taking per day: 24
  • maximum volume (litres) per day: 40,000.00
  • maximum number of days of taking in a year: 365
  • earliest calendar date of taking (mm/dd): 02/03
  • latest calendar date of taking (mm/dd): 02/02
  • period of water taking: 4 years

Source of water: drilled well 24X-0124/B1, B2, B3&B4

  • purpose of water taking: construction dewatering
  • maximum rate (litres per minute): 210.00
  • maximum number of hours of taking per day: 24
  • maximum volume (litres) per day: 300,000.00
  • maximum number of days of taking in a year: 365
  • earliest calendar date of taking (mm/dd): 02/03
  • latest calendar date of taking (mm/dd): 02/02
  • period of water taking: 4 years

Source of water: drilled well 24X-0253/C0

  • purpose of water taking: construction dewatering
  • maximum rate (litres per minute): 124.00
  • maximum number of hours of taking per day: 24
  • maximum volume (litres) per day: 180,000.00 
  • Maximum Number of Days of Taking in a Year: 365
  • Earliest Calendar date of taking (mm/dd): 02/03
  • Latest Calendar date of taking (mm/dd): 02/02
  • Period of Water Taking: 4 years

Source of water: drilled well 24X-0127/B0

  • purpose of water taking: construction dewatering
  • maximum rate (litres per minute): 70.00
  • maximum number of hours of taking per day: 24
  • maximum volume (litre) per day: 100,000.00
  • maximum number of days of taking in a year: 365
  • earliest calendar date of taking (mm/dd): 02/03
  • latest calendar date of taking (mm/dd): 02/02
  • period of water taking: 4 years

Source of water: drilled well 24X-0128/B1,B2,B3&B4

  • purpose of water taking: construction dewatering
  • maximum rate (litres per minute): 104.00
  • maximum number of hours of taking per day: 24
  • maximum volume (litres) per day: 580,000.00
  • maximum number of days of taking in a year: 365
  • earliest calendar date of taking (mm/dd): 02/03
  • latest calendar date of taking (mm/dd): 02/02
  • period of water taking: 4 years

More about Permits to take water

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Drinking Water and Environmental Compliance Division - Central Region Office
Address

5775 Yonge Street
Floor 8
Toronto, ON
M2M 4J1
Canada

Office phone number

Commentaire

La consultation est maintenant terminée.

Cette consultation a eu lieu 21 février 2020
au 22 mars 2020

Communiquer avec nous

Contact

Permit to take water coordinator (Central region)

Phone number
Office
Drinking Water and Environmental Compliance Division - Central Region Office
Address

5775 Yonge Street
Floor 8
Toronto, ON
M2M 4J1
Canada

Office phone number