Résumé de la décision
The Order was issued as described in the posting. No edits were required as a result of the public posting.
Détails de l'emplacement
Adresse du site
Pickle Lake,
ON
Canada
Détails de l'emplacement du site
12 Km West of the Town of Pickle Lake.
Proceed North on Hwy 59 for 3.3 km past the Pickle Lake turnoff, turn left and travel 14.2 km to the locked gate.
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Cadillac Ventures Inc
209-1099 Kingston Road
Pickering,
ON
L1V1B5
Canada
Détails de la décision
There were no comments received from the public which effected our decision to issue the order.
Effets de la consultation
The Ministry of Energy, Northern Development and Mines utilises a graduated compliance framework to regulate compliance with the Mining Act. The compliance Order in this posting represents the next enforcement step in our compliance process.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
How to Appeal
Appeals are not allowed
Orders issued under Section 143(2) of the Mining Act are not subject to appeal
Communiquer avec nous
Contact
Melissa Eva
933 Ramsay Lake Road
Floor B6
Sudbury,
ON
P3E 6B5
Canada
Proposition initiale
Détails de la proposition
The following are some of the major components of this closure plan that need to be addressed by the proponent:The current state of the crown pillar stability is unknown
- there is no financial assurance for the rehabilitation of waste rock areas
- there is no financial assurance for the rehabilitation of tailings areas
- there are no surface water or ground water monitoring programs for the property
- the shaft caps on the property do not meet mine rehabilitation code requirements
- there is no protection in place securing the open pits
- the waste rock and tailings on site have not been characterized in accordance with the mine rehabilitation code
- there is no physical stability monitoring program for the property
- the re-vegetation program does not meet the requirements of the mine rehabilitation code
The required closure plan amendment with accompanying financial assurance will be submitted in a form and manner in accordance with Ontario Regulation 240/00, including the Mine Rehabilitation Code of Ontario.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 20 août 2019
au 19 septembre 2019
Commentaires reçus
Par l'entremise du registre
1Par courriel
0Par la poste
0