James Dick Construction Limited - Issuance of a licence to remove over 20,000 tonnes of aggregate annually from a pit or a quarry

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Issuance of a licence to remove over 20,000 tonnes of aggregate annually from a pit or a quarry

Numéro du REO
013-1135
Numéro de référence du ministère
MNRF INST 53/17
Type d'avis
Instrument
Loi
Aggregate Resources Act, R.S.O. 1990
Affiché par
Ministry of Northern Development, Mines, Natural Resources and Forestry
Étape de l'avis
Ministry of Natural Resources and Forestry
Étape de l'avis
Décision
Décision publiée
Période de consultation
Du 8 août 2017 au 22 septembre 2017 (45 jours) Fermé
Dernière mise à jour

Cette consultation a eu lieu :

du 8 août 2017
au 22 septembre 2017

Résumé de la décision

James Dick Construction Limited was issued a licence to extract aggregate from a pit below water in the Town of Caledon.

Détails de l'emplacement

Détails de l'emplacement du site

Town of Caledon, Reginal Municipality of Peel.  

Part lots 11-13, Concession 6 WHS, Geographic Township of Caledon

A link to our mapping tool allows you to locate and view licensed sites under the ARA.

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

James Dick Construction Limited
Post Office Box Delivery 470
Bolton, ON
L7E 5T4
Canada

Détails de la décision

Aggregate Resources Act (ARA) Licence #626172 was issued on April 20, 2021 to James Dick Construction Limited to extract aggregate from a pit below water. The licensed area is 124.9 hectares in size and a combined annual tonnage of 1,800,000 tonnes with adjacent ARA licenced site #5602, also licensed to James Dick Construction Limited.

A copy of the licence can be obtained from the contact identified below. 

Commentaires reçus

Par l'entremise du registre

4

Par courriel

0

Par la poste

16
Consulter les commentaires soumis par l'entremise du registre

Effets de la consultation

Four (4) comments were received in response to the Environmental Registry of Ontario notice.

The comments expressed related to:

  • zoning
  • water quality
  • impacts to groundwater
  • traffic
  • land use compatibility
  • property values

Sixteen (16) letters of objection were received in response to the ARA consultation process. The concerns were related to protection of:

  • the natural environment
  • provincial plan conformity and zoning
  • water quality
  • quantity and groundwater monitoring
  • traffic
  • noise
  • dust and air quality
  • land use compatibility
  • property values

The applicant worked to address the comments and objections received during consultation by providing additional information and through revisions to the site plan.  At the conclusion of the ARA process there were six unresolved objections.

The application and unresolved objections were referred to the Ontario Land Tribunal (formerly the Local Planning and Appeal Tribunal) for a hearing which was held on March 22, 2021 and March 26, 2021. The Ontario Land Tribunal directed the Minister to issue the licence based on the site plan filed in the hearing.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

MNDMNRF - ROD - Integrated Aggregate Operations Section
Address

300 Water Street, 4th Floor South tower
Peterborough, ON
K9J 3C7
Canada

How to Appeal

Appeals are not allowed

There is no appeal mechanism when the Ontario Land Tribunal makes a decision.

Communiquer avec nous

Contact

Sonya Zuber

Phone number
Email address
Office
MNDMNRF - ROD - Integrated Aggregate Operations Section
Address

300 Water Street, 4th Floor South tower
Peterborough, ON
K9J 3C7
Canada

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis

Proposition initiale

Numéro du REO
013-1135
Numéro de référence du ministère
MNRF INST 53/17
Type d'avis
Instrument
Loi
Aggregate Resources Act, R.S.O. 1990
Affiché par
Ministry of Natural Resources and Forestry
Proposition affichée

Période de consultation

8 août 2017 - 22 septembre 2017 (45 days)

Détails de la proposition

Proposal updates

This notice was updated on December 27, 2019 to advise the public that this application under the Aggregate Resources Act has been referred by the Ministry of Natural Resources and Forestry to the Local Planning Appeal Tribunal.  Please refer to http://elto.gov.on.ca/tribunals/lpat/e-status/ for information on scheduled hearings of the Local Planning Appeal Tribunal.

This notice was updated on August 6, 2019 to advise the public that there has been no change to the status of the proposal and it is still being considered. No additional opportunity for comment is being provided for at this time.

Description of instrument

James Dick Construction Limited has applied for a Class “A” licence (pit below water) to remove aggregate from below the established water table. The proposed licenced area is 125 hectares (ha) in size, with an extraction area of 112 ha. The maximum annual tonnage applied for is 1,800,000 tonnes per year (a proposed combined tonnage limit with existing licence #5602). The application proposes that the site will operate as an extension to the adjacent pit, licence #5602, known as the “James Dick Erin Pit”, also owned by the applicant. The proposed site is located approximately 1km west of the village of Belfountain.

Other information

Site plan information is available to view at the Ministry of Natural Resources and Forestry (MNRF) Aurora District Office. Making an appointment to view the information is recommended to ensure aggregate staff will be available to provide information and answer questions.

Additionally, information related to this proposal is available from the following municipal office(s):

Town of Caledon
6311 Old Church Road
Caledon, ON
L7C 1J6
Phone: (905) 584-2272

Regional Municipality of Peel
10 Peel Centre Drive
Suite A and B
Brampton, ON
L6T 4B9
Phone: (905) 791-7800

Town of Erin
5684 Trafalgar Road
Hillsburg, ON
N0B 1Z0
Phone: (519) 855-4404

County of Wellington
74 Woolwich Street
Guelph, ON
N1H 3T9
Phone: (519) 837-2600

Comments received through Environmental Registry should not be construed as an objection under the Aggregate Resources Act in accordance with section 4.0 – Notification and Consultation Standards of the Provincial Standards 1.0 under the ARA. To be considered as a formal objector, individuals need to contact the MNRF contact person specified on this notice to determine how to submit an objection.

Other public consultation opportunities

Under the Aggregate Resources Act, written notice concerning this application was delivered to landowners within 120 metres of the proposed licenced boundary; an information sign, giving notice to the public of this application, was erected at the proposed site; and a Notice of Application appeared in the local paper, the Caledon Enterprise on July 6, 2017. A public information session was held on July 27, 2017 between 7 p.m. and 9 p.m. at the Erin Community Centre located at 14 Boland Drive, Erin ON.

The application for this proposal is being circulated within the Aurora District MNRF office. Additionally, notification of this application has been forwarded to the Town of Caledon, Town of Erin, Regional Municipality of Peel, County of Wellington, Credit Valley Conservation Authority, Ministry of Environment and Climate Change, Niagara Escarpment Commission, and the Ministry of Agriculture Food and Rural Affairs for comment.

All comments will be considered as part of the decision-making by the Ministry if they:

  1. are submitted in writing;
  2. reference the EBR Registry number; and
  3. are received by the Contact person within the specified comment period

** No acknowledgement or individual response will be provided to those who comment.
All comments & submissions received will become part of the public record. **

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Regional Operations Division - Aurora District
Address

50 Bloomington Road West
Aurora, ON
L4G 0L8
Canada

Office phone number

Commentaire

La consultation est maintenant terminée.

Cette consultation a eu lieu 8 août 2017
au 22 septembre 2017

Communiquer avec nous

Contact

Ben Keen

Phone number
Email address
Office
Regional Operations Division - Aurora District
Address

50 Bloomington Road West
Aurora, ON
L4G 0L8
Canada

Office phone number