Cette consultation a eu lieu :
du 26 août 2015
au 15 septembre 2015
Résumé de la décision
The application for the Permit to Take Water was cancelled by the ministry. No permit was issued.
Détails de l'emplacement
Détails de l'emplacement du site
Shikwamkwa Dam (Hollingsworth Reservoir)
Approx. 30 km E of Wawa Shikwamkwa River & Whitefish Lake
Maness, District of Algoma
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Great Lakes Power Limited
243 Industrial Park Crescent
Sault Ste. Marie,
ON
P6B 5P3
Canada
Détails de la décision
The application for the Permit to Take Water was cancelled by the ministry due to the amendment of the Ontario Water Resources Act (OWRA) to exempt water takings for the construction or operation of a dam within the meaning of the Lakes and Rivers Improvement Act (LRIA) and for dams associated with the production of electricity.
No permit was issued and the ministry closed the file on August 26, 2020.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
435 James Street South
Floor 3, Suite 331
Thunder Bay,
ON
P7E 6S7
Canada
135 St Clair Ave W
Toronto,
ON
M4V 1P5
Canada
How to Appeal
Appeals are not allowed
A permit was not required. No permit was issued.
Communiquer avec nous
Contact
Permit to take water coordinator (Northern region)
435 James Street South
Floor 3, Suite 331
Thunder Bay,
ON
P7E 6S7
Canada
Proposition initiale
Détails de la proposition
This proposal notice was updated on September 12, 2017 to advise the public that this application is still under active review. The ministry is reviewing the comments it has received to date. The original proposal date and comment period have not been altered.
Description of instrument
This proposal is for a renewal Permit to Take Water No. 4446-79NMNC to reflect the as-built conditions for post-construction water taking discharges from the Shikwamkwa Dam and for the purposes of wildlife conservation. Details of the water taking are as follows:
Permit type – Renewal
Source of water: Hollingsworth Reservoir
Purpose of taking: wildlife conservation
Maximum rate per minute (Litres): 162 000
Maximum number of hours of taking per day: 24
Maximum volume per day (Litres): 233 280 000
Maximum number of days of taking per year: 365
Length of time: up to 10 years
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
435 James Street South
Floor 3, Suite 331
Thunder Bay,
ON
P7E 6S7
Canada
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 26 août 2015
au 15 septembre 2015
Communiquer avec nous
Contact
Permit to take water coordinator (Northern region)
435 James Street South
Floor 3, Suite 331
Thunder Bay,
ON
P7E 6S7
Canada
Commentaires reçus
Par l'entremise du registre
0Par courriel
0Par la poste
0