Cette consultation a eu lieu :
du 19 janvier 2016
au 4 mars 2016
Résumé de la décision
The ministry is not issuing an approval as Welded Tube of Canada Corp. has withdrawn their application.
Détails de l'emplacement
Adresse du site
191 Ridge Road
Welland,
ON
L3B 5N7
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Welded Tube of Canada Corp.
191 Ridge Road
Welland,
ON
L3B 5N7
Canada
Détails de la décision
Welded Tube of Canada Corp. requested on April 23, 2021 in a letter to the ministry to withdraw its application for an Environmental Compliance Approval.
The ministry closed the application on April 30, 2021. No approval was issued.
Effets de la consultation
Comments received were reviewed. The comments didn’t impact the decision as the application was withdrawn by the proponent and no approval was issued.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
301 St Paul Street
Floor 9, Suite 15
St Catharines,
ON
L2R 7R4
Canada
135 St. Clair Avenue West
Floor 1
Toronto,
ON
M4V 1P5
Canada
How to Appeal
Appeals are not allowed
The application was withdrawn by the proponent and no approval was issued.
Communiquer avec nous
Contact
Application Assessment Officer
Proposition initiale
Détails de la proposition
Description of instrument
This proposal is for the renewal of the Limited Operational Flexibility for Environmental Compliance Approval (Air & Noise) # 4211-8HDK99 for Welded Tube of Canada Corp., a multi-faceted cold formed carbon and tubular steel product manufacturing facility located in the City of Welland, Ontario.
This proposal includes all emission sources from the manufacturing and associated processes that exhaust to the atmosphere including one (1) austenitizing furnace, one (1) tempering furnace, two (2) paint spray booths, three (3) cooling towers, one (1) storage tank, general ventilation exhausts, one (1) lacquer exhaust, and non-process sources of combustion equipment.
Emissions to the atmosphere from this facility include nitrogen dioxide and particulate matter.
The Environmental Compliance Approval with Limited Operational Flexibility (Air) requires that the company demonstrate compliance on an ongoing basis with Ontario Regulation 419/05, applicable Ministry Guidelines for Air and Noise and other performance requirements as specified in their conditions. It permits modifications such as process changes, de-bottlenecking or addition of new equipment, subject to limits on operational flexibility that include a production limit for the facility.
The Company has submitted an application to renew the existing Limited Operational Flexibility conditions. Of specific public interest, one condition that will be retained on the renewed Environmental Compliance Approval with Limited Operational Flexibility will require the company to make available, at all times, at the facility for inspection by interested members of the Public, a table (Emission Summary Table) that documents the facility's ongoing compliance.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
301 St Paul Street
Floor 9, Suite 15
St Catharines,
ON
L2R 7R4
Canada
135 St. Clair Avenue West
Floor 1
Toronto,
ON
M4V 1P5
Canada
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 19 janvier 2016
au 4 mars 2016
Commentaires reçus
Par l'entremise du registre
3Par courriel
0Par la poste
0