Cette consultation a eu lieu :
du 9 juillet 2024
au 8 août 2024
Résumé de la proposition
This proposal is for an amendment to Permit to Take Water No. 8080-ALJGR5 for mining dewatering purposes. Water will be taken from four wells in Sudbury, Ontario.
Détails de l'emplacement
Adresse du site
1701 Elm Street
Sudbury,
ON
Canada
Détails de l'emplacement du site
Copper Cliff Mine North
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Vale Canada Limited/Vale Canada Limitée
1500 - 200 Bay Street
Toronto,
ON
M5J 2K2
Canada
Détails de la proposition
This proposal is for an amendment to Permit to Take Water No. 8080-ALJGR5 for mining dewatering purposes. Water will be taken from four wells in Sudbury, Ontario. Details of the water taking are as follows:
Permit type – Amendment
Source of water: South Mine Shaft
Purpose of Water Taking: Mine Dewatering
- maximum rate (litres per minute): 4,200
- maximum number of hours of taking per day: 24
- maximum volume (litres) per day: 6,048,000
- maximum number of days of taking in a year: 365
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- period of water taking: 10 years
Source of water: 114 Orebody Ramp
Purpose of Water Taking: Mine Dewatering
- maximum rate (litres per minute): 190
- maximum number of hours of taking per day: 24
- maximum volume (litres) per day: 273,000
- maximum number of days of taking in a year: 365
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- period of water taking: 10 years
Source of water: 175 Pit
Purpose of Water Taking: Mine Dewatering
- maximum rate (litres per minute): 1,420.00
- maximum number of hours of taking per day: 24
- maximum volume (litres) per day: 2,044,800
- maximum number of days of taking in a year: 365
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- period of water taking: 10 years
Source of water: North Mine Shaft
Purpose of Water Taking: Mine Dewatering
- maximum rate (litres per minute): 5,700
- maximum number of hours of taking per day: 24
- maximum volume (litres) per day: 8,208,000
- maximum number of days of taking in a year: 365
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- period of water taking: 10 years
There are 3 categories of a Permit to Take Water:
- Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
- Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
- Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference
The proposed water taking qualifies as a Category 3 permit.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 9 juillet 2024
au 8 août 2024