Update Announcement
This notice is being updated on January 13, 2021 to advise the public that this amendment to the Closure Plan for the Kidd Creek Metallurgical Plant site is still being reviewed by the ministry, in accordance with O. Reg. 240/00 requirements.
Cette consultation a eu lieu :
du 21 février 2019
au 23 mars 2019
Résumé de la décision
The amendment has been returned for refiling.
Détails de l'emplacement
Détails de l'emplacement du site
Hoyle Township
27km East of Timmins, Ontario via Highway 101
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Glencore Canada Corporation
100 King Street West
Suite 6900
Toronto,
ON
M5X 1E3
Canada
Détails de la décision
The amendment has been returned for refiling.
Effets de la consultation
No comments were received through the Environmental Registry of Ontario resulting in no impact on the decision whether or not to proceed with this proposal.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
5520 Highway 101 E Highway
PO Box 3060
South Porcupine Ontario,
ON
P0N 1H0
Canada
How to Appeal
Les appels ne sont pas autorisés
Ce type d’acte ne peut être porté en appel. En savoir plus sur notre processus de consultation.
Communiquer avec nous
Contact
Andrew Persad
5520 Highway 101 East
PO Box 3060
South Porcupine,
ON
P0N 1H0
Canada
Proposition initiale
Détails de la proposition
Description of Instrument
Glencore Canada Corporation has submitted a Kidd Met Plant Closure Plan Amendment for filing by the Ministry of Energy, Northern Development and Mines as required under the Mining Act. This Closure Plan Amendment proposes rehabilitation measures to be implemented upon the eventual closure of Glencore Canada’s Kidd Met Plant.
The following are the major components of this Closure Plan Amendment as proposed by Glencore Canada Corporation:
- Kidd Met Plant Site
- Address remaining items from July 2013 Rehabilitation inspection report
- Incorporation previous Notices of Material Change
- Name Change
- Demolition of Bedding Plant
- Demolition of Administration Building
- Asbestos removal from administration building
- Updated Site Plan and Building Inventory
- Updated asbestos survey
- Minor adjustments to soil cover configuration – growth media thickness (25cm reduced to 15cm)
- Diversion of some unimpacted surface waters to southern watershed
- Append Hoyle soil study
- Update groundwater monitoring well network
- Update Closure Costs and Financial Assurance
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
5520 Highway 101 E Highway
PO Box 3060
South Porcupine Ontario,
ON
P0N 1H0
Canada
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 21 février 2019
au 23 mars 2019
Communiquer avec nous
Contact
Andrew Persad
5520 Highway 101 East
PO Box 3060
South Porcupine,
ON
P0N 1H0
Canada
Commentaires reçus
Par l'entremise du registre
0Par courriel
0Par la poste
0