Cette consultation a eu lieu :
du 1 mars 2024
au 15 avril 2024
Résumé de la décision
A-Gas Canada Inc. has withdrawn its Environmental Compliance Approval application (air & noise) and hence, an Environmental Compliance Approval was not issued by the ministry.
Détails de l'emplacement
Adresse du site
333 Arvin Avenue
Stoney Creek,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
A-Gas Canada Inc.
333 Arvin Avenue
Stoney Creek,
ON
L8E 2M6
Canada
Détails de la décision
A-Gas Canada Inc. withdrew its Environmental Compliance Approval application as advised in their letter sent to the ministry, dated June 7, 2024 (see attached letter from A-Gas Canada Inc.). The ministry has closed the company’s application and we did not issue an Environmental Compliance Approval (air and noise) for the scope of work indicated in the proposal notice.
See the attached cancellation letter, dated June 17, 2024 , sent by the ministry to advise A-Gas Canada Inc. that their application was closed and their original submitted application fee, less the non-refundable application processing fee, is being refunded.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St. Clair Avenue West
Floor 1
Toronto,
ON
M4V 1P5
Canada
How to Appeal
Appeals are not allowed
The proponent has withdrawn their ECA Application.
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Proposition initiale
Détails de la proposition
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air) which replaces all the current Environmental Compliance Approvals for air at this facility and includes the addition of new or historically unapproved sources for all emissions from A-Gas Canada Inc., operating a refrigerant gas manufacturing facility located in Stoney Creek, Ontario.
The application includes all sources at the facility used in the operation of the refrigerant gas filling system, including:
- comfort heating equipment (HVAC units)
- a gas storage container, and
- a gas fill station
Emissions to the air from this facility include nitrogen oxides.
The Environmental Compliance Approval with Limited Operational Flexibility (air), when issued permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air). The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St. Clair Avenue West
Floor 1
Toronto,
ON
M4V 1P5
Canada
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 1 mars 2024
au 15 avril 2024
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaires reçus
Par l'entremise du registre
0Par courriel
0Par la poste
0