2241960 Ontario Inc. - Certificate of property use

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Certificate of property use

Numéro du REO
019-8141
Numéro de référence du ministère
7350-AZ4UBX-1
Type d'avis
Instrument
Loi
Environmental Protection Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Proposition Mis à jour
Proposition affichée
Période de consultation
Du 15 janvier 2024 au 29 février 2024 (45 jours) Fermé
Dernière mise à jour

Update Announcement

This notice was originally published on January 15, 2024 for a 30-day commenting period ending February 14, 2024. We extended the comment period on February 13, 2024 for another 15 days.

Cette consultation a eu lieu :

du 15 janvier 2024
au 29 février 2024

Résumé de la proposition

The ministry has accepted the risk assessment prepared for the owner (2241960 Ontario Inc.) for the property (13471 Lakeridge Road, Scugog). The director is considering issuing a Certificate of Property Use ("CPU") in relation to the property.

Détails de l'emplacement

Adresse du site

13471 Lakeridge Road
Scugog Township, ON
L9P 1R4
Canada

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

2241960 Ontario Inc.
P.O. Box 133
Port Perry, ON
L9L 1A2
Canada

Détails de la proposition

A risk assessment was undertaken for this property to establish the risks that the contaminants may pose to future users and to identify appropriate risk management measures to be implemented to ensure that the property is suitable for the intended use of residential land use as defined by O. Reg. 153/04 (the "Regulation"), as amended, made under the Environmental Protection Act (the "Act").

The Ministry has accepted the risk assessment prepared for the owner for the property.

Based on the documents provided to the ministry as part of the risk assessment reports, the reviewers confirmed that the risk assessment has been conducted in accordance with the Act, the Regulation, and the associated guidance documents.

The director provided the proponent with written Notice of the Director’s Decision to accept the risk assessment relating to the property in accordance with section 168.5 of the Act on October 3, 2023.

The director is considering issuing a Certificate of Property Use ("CPU") in relation to the property. The CPU incorporates the risk management measures proposed in the risk assessment and any additional conditions proposed by the director. A section 197 Order is included and requires that a certificate be registered on the property title in accordance with section 197 of the Act and that before dealing with the property in any way, a copy of the CPU must be given to any person who will acquire an interest in the property.

The proposed risk management measures include:

  • a requirement for barriers to site soils including hard caps and/or fill caps;
  • a soil and groundwater management plan for any intrusive activities;
  • a health and safety plan for any intrusive activities;
  • vapour mitigation measures for new residential buildings, including a vapour barrier and soil vapour intrusion mitigation system;
  • a restriction on new groundwater water supply wells
  • a groundwater monitoring program; and
  • annual reporting

The proposed draft CPU No. 7350-AZ4UBX -1 including the section 197 Order, is provided as a link under the Supporting Materials section of this notice.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

York Durham District Office
Address

230 Westney Road South
Floor 5
Ajax, ON
L1S 7J5
Canada

Office phone number

Commentaire

La consultation est maintenant terminée.

La période de consultation a eu lieu du 15 janvier 2024
au 29 février 2024

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis