Groupe CRH Canada Inc./CRH Canada Group Inc. - Environmental Compliance Approval (air)

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Environmental Compliance Approval (air)

Numéro du REO
013-4187
Numéro de référence du ministère
1000029044
Type d'avis
Instrument
Loi
Environmental Protection Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Décision Mis à jour
Décision publiée
Période de consultation
Du 20 novembre 2018 au 4 janvier 2019 (45 jours) Fermé
Dernière mise à jour

Update Announcement

This proposal notice has been updated on March 24, 2020 to advise the public that this application is still under active review. The ministry is reviewing the comments it has received to date. The original proposal date and comment period have not been altered.

Cette consultation a eu lieu :

du 20 novembre 2018
au 4 janvier 2019

Résumé de la décision

This approval is for an amendment to an existing ECA (Air) for all emissions from the Dufferin Concrete Burlington facility, producing ready-mix concrete, for the purpose of revisions to the production limit, reconfiguration of on-site activities, addition of crushing operations, and a request for Limited Operational Flexibility.

Détails de l'emplacement

Adresse du site

3087 Harrison Court
Burlington, ON
L7R 3X4
Canada

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

Groupe CRH Canada Inc./CRH Canada Group Inc.
2300 Steeles Avenue West
Concord, ON
L4K 5X6
Canada

Détails de la décision

This approval is for an Environmental Compliance Approval with Limited Operational Flexibility (Air), which replaces all the current Environmental Compliance Approvals for Air at this facility, and includes the addition of new, or historically unapproved, sources for all emissions from the Groupe CRH Canada Inc. / CRH Canada Group Inc. Dufferin Concrete Burlington Plant, a facility producing ready-mix concrete located in Burlington, Ontario.

The approval includes all sources at the facility, including the emissions from the delivery of raw materials, production, shipping, and crushing. Emissions to the air from this facility include:

  • calcium carbonate
  • calcium sulfate
  • nitrogen oxides
  • calcium oxide
  • total suspended particulate
  • noise

The Environmental Compliance Approval with Limited Operational Flexibility (Air), when issued, permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (Air).

The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.

Commentaires reçus

Par l'entremise du registre

0

Par courriel

0

Par la poste

0
Consulter les commentaires soumis par l'entremise du registre

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

How to Appeal

Cet avis de décision peut être porté en appel. Vous avez jusqu’à 15 jours à partir du 4 mai 2020 pour entamer le processus d’appel.

Veuillez lire les renseignements suivants attentivement pour en savoir plus sur le processus d’appel.

Comment interjeter appelClick to Expand Accordion

For instrument decisions published on or after June 1, 2021, please refer to the updated instructions for information on how to appeal a decision.

Appeal process for decisions published before June 1, 2021

If you’re an Ontario resident, you can start the process to appeal this instrument decision.

First, you’ll need to seek leave (i.e. get permission) from the relevant appellate body to appeal the decision.

If the appellate body grants leave, the appeal itself will follow.

Seek leave to appeal

To seek leave to appeal, you need to do these three things:

  1. prepare your application
  2. provide notice to the minister
  3. mail your application to three parties

1. Prepare your application

You’ll need to prepare an application. You may wish to include the following things in your application:

  1. A document that includes:
    • your name, phone number, fax number (if any), and/or email address
    • the ERO number and ministry reference number (located on this page)
    • a statement about whether you are a resident in Ontario
    • your interest in the decision, and any facts you want taken into account in deciding whether you have an interest in the decision
    • the parts of the instrument that you’re challenging
    • whether the decision could result in significant harm to the environment
    • the reason(s) why you believe that no reasonable person – having regard to the relevant law and to any government policies developed to guide decisions of that kind – could have made the decision
    • the grounds (facts) you’ll be using to appeal
    • the outcome you’d like to see
  2. A copy of the instrument (approval, permit, order) that you you are seeking leave to appeal. You’ll find this in the decision notice on the Environmental Registry
  3. Copies of all supporting documents, facts and evidence that you’ll be using to appeal
What is considered

The appeal body will consider the following two questions in deciding whether to grant you leave to appeal:

  1. is there is good reason to believe that no reasonable person, with respect to the relevant law and to any government policies developed to guide decisions of that kind, could have made the decision?
  2. could the decision you wish to appeal result in significant harm to the environment?

2. Provide your notice

You’ll need to provide notice to the Minister of the Environment, Conservation and Parks that you’re seeking leave to appeal.

In your notice, please include a brief description of the:

  • decision that you wish to appeal
  • grounds for granting leave to appeal

You can provide notice by email at minister.mecp@ontario.ca or by mail at:

College Park 5th Floor, 777 Bay St.
Toronto, ON 
M7A 2J3

3. Mail your application

You’ll need to mail your application that you prepared in step #1 to each of these three parties:

  • appellate body
  • issuing authority (the ministry official who issued the instrument)
  • proponent (the company or individual to whom the instrument was issued)

Autorité compétente
Bahar Aminvaziri
Manager

Environmental Assessment and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada

416-314-7974

Proponent(s)

Groupe CRH Canada Inc./CRH Canada Group Inc.
2300 Steeles Avenue West
Concord, ON
L4K 5X6
Canada


Organe d’appel

Environmental Review Tribunal
Attention: The Secretary
655 Bay Street
Floor 15
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca

About the Environmental Review Tribunal


Inclure les éléments suivants:

Numéro du REO
013-4187
Numéro de référence du ministère
1000029044

Il ne s'agit pas d'un avis juridique. Veuillez vous reporter à la Charte des droits environnementaux de 1993 pour connaître les exigences exactes prévues par la loi. Consultez un avocat si vous avez besoin d'aide avec le processus d'appel.

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis

Proposition initiale

Numéro du REO
013-4187
Numéro de référence du ministère
1000029044
Type d'avis
Instrument
Loi
Environmental Protection Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Proposition affichée

Période de consultation

20 novembre 2018 - 4 janvier 2019 (45 days)

Détails de la proposition

Description of instrument

This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (Air) which replaces all the current Environmental Compliance Approvals for Air and includes the addition of new or historically unapproved sources for all emissions from the Groupe CRH Canada Inc./ CRH Canada Group Inc. Dufferin Concrete Burlington Plant, a facility producing ready-mix concrete located in Burlington, Ontario.

The proposal includes all sources at the facility, including the emissions from the delivery of raw materials, production, shipping, and crushing.

Emissions to the air from this facility include:

  • calcium carbonate,
  • calcium sulfate,
  • nitrogen oxides,
  • calcium oxide,
  • total suspended particulate, and
  • noise.

The Environmental Compliance Approval with Limited Operational Flexibility (Air), when issued permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (Air).

The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Commentaire

La consultation est maintenant terminée.

Cette consultation a eu lieu 20 novembre 2018
au 4 janvier 2019

Communiquer avec nous

Contact