Cameco Corporation - Environmental Compliance Approval (air)

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Environmental Compliance Approval (air)

Numéro du REO
019-7962
Numéro de référence du ministère
9876-CXFL84
Type d'avis
Instrument
Loi
Environmental Protection Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Décision
Décision publiée
Période de consultation
Du 30 novembre 2023 au 14 janvier 2024 (45 jours) Fermé
Dernière mise à jour

Cette consultation a eu lieu :

du 30 novembre 2023
au 14 janvier 2024

Résumé de la décision

An approval was issued to amend Environmental Compliance Approval (air & noise) No. 2229-9FFK9G for the renewal of the Operational Flexibility conditions for Cameco Corporation, a uranium conversion facility, located at 1 Eldorado Place in Port Hope, Ontario.

Détails de l'emplacement

Adresse du site

1 Eldorado Place
Port Hope, ON
Canada

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

Cameco Corporation
1 Eldorado Place
Port Hope, ON
L1A 3A1
Canada

Détails de la décision

An approval was issued to amend Environmental Compliance Approval (air & noise) No. 2229-9FFK9G for the renewal of the Operational Flexibility conditions for Cameco Corporation, a uranium conversion facility, located at 1 Eldorado Place in Port Hope, Ontario.

The emission sources from the manufacturing and associated processes that discharge to the air include:

  • uranium dioxide processing
  • uranium hexafluoride processing
  • analytical laboratories
  • natural gas fired boilers for steam production

The facility production limit of 12,500 tonnes of uranium as uranium hexafluoride per year (UF6), and 2,800 tonnes of uranium as uranium dioxide per year (UO2) remains unchanged.

Emissions to the air from this facility include:

  • suspended particulate matter
  • metals such as uranium, copper, nickel and tin
  • fluorides
  • ammonia
  • volatile organic compounds such as trichloroethylene
  • products of combustion such as nitrogen oxides

The approval is an Environmental Compliance Approval (air) with Operational Flexibility, which is a single approval that replaces all the current Environmental Compliance Approvals for air at this facility, and includes the addition of new, or historically unapproved, sources for all emissions from the facility.

The Environmental Compliance Approval (air) with Operational Flexibility requires that the company demonstrates compliance on an ongoing basis with:

  • Ontario Regulation 419/05
  • applicable ministry guidelines for air and noise
  • other performance requirements as specified in their conditions

It permits modifications such as process changes, de-bottlenecking or addition of new equipment subject to limits on operational flexibility that include a production limit for the facility specified in the approval.

The operational flexibility conditions have a 10 years expiry date. The company is required to make an application for amendment at that time to renew these conditions. Of specific public interest, one condition that is included in the approval requires the company to make available, at all times, at the facility for inspection by interested members of the public a table (emission summary table) that documents the facility’s compliance with Ontario Regulation 419/05.

Commentaires reçus

Par l'entremise du registre

0

Par courriel

0

Par la poste

0
Consulter les commentaires soumis par l'entremise du registre

Effets de la consultation

No comments were received.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

How to Appeal

Cet avis de décision peut être porté en appel. Vous avez jusqu’à 15 jours à partir du 7 août 2024 pour entamer le processus d’appel.

Veuillez lire les renseignements suivants attentivement pour en savoir plus sur le processus d’appel.

Comment interjeter appelClick to Expand Accordion

Start the process to appeal

If you’re an Ontario resident, you can start the process to appeal this instrument decision.

First, you’ll need to seek leave (i.e. get permission) from the relevant appellate body to appeal the decision.

If the appellate body grants leave, the appeal itself will follow.

Seek leave to appeal

To seek leave to appeal, you need to do these three things:

  1. prepare your application
  2. provide notice to the minister
  3. mail your application to three parties

1. Prepare your application

You’ll need to prepare an application. You may wish to include the following things in your application:

  1. A document that includes:
    • your name, phone number, fax number (if any), and/or email address
    • the ERO number and ministry reference number (located on this page)
    • a statement about whether you are a resident in Ontario
    • your interest in the decision, and any facts you want taken into account in deciding whether you have an interest in the decision
    • the parts of the instrument that you’re challenging
    • whether the decision could result in significant harm to the environment
    • the reason(s) why you believe that no reasonable person – having regard to the relevant law and to any government policies developed to guide decisions of that kind – could have made the decision
    • the grounds (facts) you’ll be using to appeal
    • the outcome you’d like to see
  2. A copy of the instrument (approval, permit, order) that you you are seeking leave to appeal. You’ll find this in the decision notice on the Environmental Registry
  3. Copies of all supporting documents, facts and evidence that you’ll be using to appeal
What is considered

The appeal body will consider the following two questions in deciding whether to grant you leave to appeal:

  1. is there is good reason to believe that no reasonable person, with respect to the relevant law and to any government policies developed to guide decisions of that kind, could have made the decision?
  2. could the decision you wish to appeal result in significant harm to the environment?

2. Provide your notice

You’ll need to provide notice to the Minister of the Environment, Conservation and Parks that you’re seeking leave to appeal.

In your notice, please include a brief description of the:

  • decision that you wish to appeal
  • grounds for granting leave to appeal

You can provide notice by email at minister.mecp@ontario.ca or by mail at:

College Park 5th Floor, 777 Bay St.
Toronto, ON
M7A 2J3

3. Mail your application

You’ll need to mail your application that you prepared in step #1 to each of these three parties:

  • appellate body
  • issuing authority (the ministry official who issued the instrument)
  • proponent (the company or individual to whom the instrument was issued)

Autorité compétente
Nancy Orpana
Manager, Air Approvals

Environmental Permissions Branch
135 St. Clair Avenue West
Toronto, ON
M4V 1P5
Canada

(613) 484-2675

Proponent(s)

Cameco Corporation
1 Eldorado Place
Port Hope, ON
L1A 3A1
Canada


Organe d’appel

Registrar, Ontario Land Tribunal
655 Bay Street, Suite 1500
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca

About the Ontario Land Tribunal


Inclure les éléments suivants:

Numéro du REO
019-7962
Numéro de référence du ministère
9876-CXFL84

Il ne s'agit pas d'un avis juridique. Veuillez vous reporter à la Charte des droits environnementaux de 1993 pour connaître les exigences exactes prévues par la loi. Consultez un avocat si vous avez besoin d'aide avec le processus d'appel.

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis

Proposition initiale

Numéro du REO
019-7962
Numéro de référence du ministère
9876-CXFL84
Type d'avis
Instrument
Loi
Environmental Protection Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Proposition affichée

Période de consultation

30 novembre 2023 - 14 janvier 2024 (45 days)

Détails de la proposition

This proposal is for the renewal of the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 2229-9FFK9G for Cameco Corporation, a uranium conversion facility, located at 1 Eldorado Place in Port Hope, Ontario.

The emission sources from the manufacturing and associated processes that discharge to the air include:

  • uranium dioxide processing
  • uranium hexafluoride processing
  • uranium metal production and casting
  • developmental laboratories
  • analytical laboratories
  • steam production

The facility operates with a facility production limit of 12,500 tonnes of uranium as uranium hexafluoride per year (UF6), and 2,800 tonnes of uranium as uranium dioxide per year (UO2).

Emissions to the air from this facility include:

  • volatile organic compounds such as trichloroethylene
  • metals such as copper, nickel and tin
  • particulate matter
  • products of combustion such as nitrogen oxides

The Environmental Compliance Approval with Limited Operational Flexibility (air), when issued, permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air).

The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

Commentaire

La consultation est maintenant terminée.