Cette consultation a eu lieu :
du 13 octobre 2023
au 27 novembre 2023
Résumé de la décision
The Ministry has issued an Environmental Compliance Approval for the modifications to the transformer and oil containment system located at Brimley-Seminole Station at 657 Brimley Road, in the city of Toronto.
Détails de l'emplacement
Adresse du site
657 Brimley Road
Toronto,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Toronto Hydro-Electric System Limited
715 Milner Avenue
Toronto,
ON
M1B 6B6
Canada
Détails de la décision
The Ministry has issued a new Environmental Compliance Approval for the establishment of sewage works for the collection, transmission, treatment, and disposal of stormwater.
The purpose of the project is to upgrade the transformer and oil containment system located at Brimley-Seminole Station at 657 Brimley Road, in the City of Toronto. The work consists of an individual passive oil containment pit for the transformer having a minimum capacity of approximately 11,557 liters. The pit liners will be comprised of passive materials with a containment system. The system allows rainwater to filter through the liner materials but becomes impermeable when in contact with oil.
Given the soil condition at the site, a drainage system will be provided below the containment system to prevent water from accumulating in the pit and potentially reducing the available storage capacity. This drainage system was connected to an on-site sump pit. The sump pump will discharge to the nearby rip-rap daylight outlet. The pump will be controlled by a recommended oil-sensing device in the pit to prevent accidental discharge of transformer oil to the property surface.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
5775 Yonge Street
Floor 9
Toronto,
ON
M2M 4J1
Canada
How to Appeal
Cet avis de décision peut être porté en appel. Vous avez jusqu’à 15 jours à partir du 2 juillet 2024 pour entamer le processus d’appel.
Veuillez lire les renseignements suivants attentivement pour en savoir plus sur le processus d’appel.
Comment interjeter appelClick to Expand Accordion
Start the process to appeal
If you’re an Ontario resident, you can start the process to appeal this instrument decision.
First, you’ll need to seek leave (i.e. get permission) from the relevant appellate body to appeal the decision.
If the appellate body grants leave, the appeal itself will follow.
Seek leave to appeal
To seek leave to appeal, you need to do these three things:
- prepare your application
- provide notice to the minister
- mail your application to three parties
1. Prepare your application
You’ll need to prepare an application. You may wish to include the following things in your application:
- A document that includes:
- your name, phone number, fax number (if any), and/or email address
- the ERO number and ministry reference number (located on this page)
- a statement about whether you are a resident in Ontario
- your interest in the decision, and any facts you want taken into account in deciding whether you have an interest in the decision
- the parts of the instrument that you’re challenging
- whether the decision could result in significant harm to the environment
- the reason(s) why you believe that no reasonable person – having regard to the relevant law and to any government policies developed to guide decisions of that kind – could have made the decision
- the grounds (facts) you’ll be using to appeal
- the outcome you’d like to see
- A copy of the instrument (approval, permit, order) that you you are seeking leave to appeal. You’ll find this in the decision notice on the Environmental Registry
- Copies of all supporting documents, facts and evidence that you’ll be using to appeal
What is considered
The appeal body will consider the following two questions in deciding whether to grant you leave to appeal:
- is there is good reason to believe that no reasonable person, with respect to the relevant law and to any government policies developed to guide decisions of that kind, could have made the decision?
- could the decision you wish to appeal result in significant harm to the environment?
2. Provide your notice
You’ll need to provide notice to the Minister of the Environment, Conservation and Parks that you’re seeking leave to appeal.
In your notice, please include a brief description of the:
- decision that you wish to appeal
- grounds for granting leave to appeal
You can provide notice by email at minister.mecp@ontario.ca or by mail at:
College Park 5th Floor, 777 Bay St.
Toronto, ON
M7A 2J3
3. Mail your application
You’ll need to mail your application that you prepared in step #1 to each of these three parties:
- appellate body
- issuing authority (the ministry official who issued the instrument)
- proponent (the company or individual to whom the instrument was issued)
Toronto Hydro-Electric System Limited
715 Milner Avenue
Toronto,
ON
M1B 6B6
Canada
Registrar, Ontario Land Tribunal
655 Bay Street, Suite 1500
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca
Inclure les éléments suivants:
Il ne s'agit pas d'un avis juridique. Veuillez vous reporter à la Charte des droits environnementaux de 1993 pour connaître les exigences exactes prévues par la loi. Consultez un avocat si vous avez besoin d'aide avec le processus d'appel.
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Proposition initiale
Détails de la proposition
This application is for a new Environmental Compliance Approval for the establishment of sewage works for the collection, transmission, treatment, and disposal of stormwater.
The purpose of the project is to upgrade the transformer and oil containment system located at Brimley-Seminole Station at 657 Brimley Road, in the City of Toronto. The work consists of an individual passive oil containment pit for the transformer having a minimum capacity of approximately 11,557 liters. The pit liners will be comprised of passive materials with a containment system. The system allows rainwater to filter through the liner materials but becomes impermeable when in contact with oil.
Given the soil condition at the site, a drainage system will be provided below the containment system to prevent water from accumulating in the pit and potentially reducing the available storage capacity. This drainage system was connected to an on-site sump pit. The sump pump will discharge to the nearby rip-rap daylight outlet. The pump will be controlled by a recommended oil-sensing device in the pit to prevent accidental discharge of transformer oil to the property surface.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 13 octobre 2023
au 27 novembre 2023
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaires reçus
Par l'entremise du registre
0Par courriel
0Par la poste
0