Cette consultation a eu lieu :
du 3 octobre 2023
au 17 novembre 2023
Résumé de la décision
Environmental Compliance Approval number 5207-D5XNTF was granted to JPI Farms for the proposed Phase 3 agricultural greenhouse development, for the collection, transmission, treatment and disposal of stormwater run-off from the lands located at 422 Mersea Road 7, in the Municipality of Leamington, County of Essex, Ontario.
Détails de l'emplacement
Adresse du site
422 Mersea Road 7
Municipality of Leamington,
ON
N8H 3V8
Canada
Détails de l'emplacement du site
JPI Farms
422 Mersea Road 7
Leamington Municipality, County of Essex N8H 3V8
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
JPI Farms Inc.
422 Mersea Road 7
Leamington,
ON
N8H 3V8
Canada
Détails de la décision
Environmental Compliance Approval number 5207-D5XNTF was granted to JPI Farms Inc. for the stormwater management works serving the JPI Farms greenhouse site.
It includes new stormwater management facilities, including a stormwater management pond, floodable grassed storage area, oil grit separator, and onsite roof water drainage systems, swales and onsite storm sewers to accommodate the proposed Phase 3 greenhouse expansion for collection, transmission, treatment and disposal of stormwater run-off from the lands located at 422 Mersea Road 7, in the Municipality of Leamington, County of Essex, Ontario, discharging to the Silver Creek Drain and Lebo Creek - 7th Concession Branch Drains.
Effets de la consultation
No comments were received.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
4510 Rhodes Dr
Windsor,
ON
N8W 5K5
Canada
How to Appeal
Cet avis de décision peut être porté en appel. Vous avez jusqu’à 15 jours à partir du 27 juin 2024 pour entamer le processus d’appel.
Veuillez lire les renseignements suivants attentivement pour en savoir plus sur le processus d’appel.
Comment interjeter appelClick to Expand Accordion
Start the process to appeal
If you’re an Ontario resident, you can start the process to appeal this instrument decision.
First, you’ll need to seek leave (i.e. get permission) from the relevant appellate body to appeal the decision.
If the appellate body grants leave, the appeal itself will follow.
Seek leave to appeal
To seek leave to appeal, you need to do these three things:
- prepare your application
- provide notice to the minister
- mail your application to three parties
1. Prepare your application
You’ll need to prepare an application. You may wish to include the following things in your application:
- A document that includes:
- your name, phone number, fax number (if any), and/or email address
- the ERO number and ministry reference number (located on this page)
- a statement about whether you are a resident in Ontario
- your interest in the decision, and any facts you want taken into account in deciding whether you have an interest in the decision
- the parts of the instrument that you’re challenging
- whether the decision could result in significant harm to the environment
- the reason(s) why you believe that no reasonable person – having regard to the relevant law and to any government policies developed to guide decisions of that kind – could have made the decision
- the grounds (facts) you’ll be using to appeal
- the outcome you’d like to see
- A copy of the instrument (approval, permit, order) that you you are seeking leave to appeal. You’ll find this in the decision notice on the Environmental Registry
- Copies of all supporting documents, facts and evidence that you’ll be using to appeal
What is considered
The appeal body will consider the following two questions in deciding whether to grant you leave to appeal:
- is there is good reason to believe that no reasonable person, with respect to the relevant law and to any government policies developed to guide decisions of that kind, could have made the decision?
- could the decision you wish to appeal result in significant harm to the environment?
2. Provide your notice
You’ll need to provide notice to the Minister of the Environment, Conservation and Parks that you’re seeking leave to appeal.
In your notice, please include a brief description of the:
- decision that you wish to appeal
- grounds for granting leave to appeal
You can provide notice by email at minister.mecp@ontario.ca or by mail at:
College Park 5th Floor, 777 Bay St.
Toronto, ON
M7A 2J3
3. Mail your application
You’ll need to mail your application that you prepared in step #1 to each of these three parties:
- appellate body
- issuing authority (the ministry official who issued the instrument)
- proponent (the company or individual to whom the instrument was issued)
JPI Farms Inc.
422 Mersea Road 7
Leamington,
ON
N8H 3V8
Canada
Registrar, Ontario Land Tribunal
655 Bay Street, Suite 1500
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca
Inclure les éléments suivants:
Il ne s'agit pas d'un avis juridique. Veuillez vous reporter à la Charte des droits environnementaux de 1993 pour connaître les exigences exactes prévues par la loi. Consultez un avocat si vous avez besoin d'aide avec le processus d'appel.
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Proposition initiale
Détails de la proposition
This proposal is for an Environmental Compliance Approval amendment application serving JPI Farms Inc. for the stormwater management works serving the JPI Farms greenhouse site. It includes new stormwater management facilities, including a S.W.M. detention pond and grassed storage/parking area, to accommodate the proposed Phase 3 greenhouse expansion for collection, transmission, treatment and disposal of stormwater run-off from the lands located at 422 Mersea Road 7, in the Municipality of Leamington, County of Essex, Ontario.
The stormwater management facilities consist of:
- roof water drainage pipe systems, swales and on-site storm sewers, discharging roof top runoff and other surface runoff to the stormwater detention pond
- one stormwater pump station
- one stormwater management wet pond having an active storage volume of 26,108 cubic meters with a maximum water depth of 2.887 meters for the 1:100 year storm event, discharging a maximum release rate of 280 litres per second into the Silver Creek and Lebo Creek - 7th Concession Branch Drains
- two outlet catchbasin manholes and associated outlet pipes to distribute discharges into both the Silver Creek and Lebo Creek - 7th Concession Branch Drains
- overflow route to the temporary stockpile area through a temporary cut-off swale (events in excess of 1:100 year)
- one oil grit separator (OGS) ADS model FD-6HD or approved equal
- one grassed floodable area and parking lot storage area having an active storage volume of 620 cubic meters with a maximum water depth of 0.517 meters for the 1:100 year storm event, discharging a maximum release rate of 70 liters per second into the Silver Creek and Lebo Creek - 7th Concession Branch Drains
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 3 octobre 2023
au 17 novembre 2023
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaires reçus
Par l'entremise du registre
0Par courriel
0Par la poste
0