La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Appeal of Stelco Inc. - Environmental Compliance Approval (air)

Numéro du ERO
019-7370
Étape de l'avis
Appel
Appel publié
Dernière mise à jour

Résumé de l'appel

Nanticoke Properties LP has sought leave to appeal this decision.

Détails de l’appel

This notice is given by the applicant in accordance with section 47 of the Environmental Bill of Rights, 1993. The notice was prepared by the applicant and represents its position. It does not represent or reflect the views of the Government of Ontario, nor does the Government of Ontario make any representations about the accuracy of the content of this notice.

Nanticoke Properties LP has sought leave to appeal the decision to issue an Environmental Compliance Approval (air) to Stelco Inc., a manufacturer of integrated steel at a facility located at 2330 Haldimand Road 3, Haldimand, Ontario

Additional details can be found on the Ontario Lands Tribunal website.

The case number is OLT-23-000995.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Communiquer avec nous

Personne-ressource

More information, including hearing dates and locations can be provided by the appellate body.  Additional information about the instrument appeal process, can be provided by the Ministry of the Environment, Conservation and Parks.

Registrar, Ontario Land Tribunal
655 Bay Street, Suite 1500
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca

About the Ontario Land Tribunal

Ministry of the Environment, Conservation and Parks
Environmental Bill of Rights Office
40 St. Clair Ave. West
12th Floor
Toronto, ON
M4V 1M2

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis


Original decision

Stelco Inc. - Environmental Compliance Approval (air)

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Environmental Compliance Approval (air)

Numéro du REO
019-7370
Numéro de référence du ministère
8923-CSJGL7
Type d'avis
Instrument
Loi
Environmental Protection Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Décision Appel
Décision publiée
Période de consultation
Du 18 juillet 2023 au 1 septembre 2023 (45 jours) Fermé
Dernière mise à jour

Cette consultation a eu lieu :

du 18 juillet 2023
au 1 septembre 2023

Résumé de la décision

We have issued an Environmental Compliance Approval (air) to Stelco Inc., a manufacturer of integrated steel at a facility located at 2330 Haldimand Road 3, Haldimand, Ontario.

Détails de l'emplacement

Adresse du site

2330 Haldimand Road 3
Haldimand County, ON
N0A 1L0
Canada

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

Stelco Inc.
2330 Haldimand Road 3
Haldimand County, ON
N0A 1L0
Canada

Détails de la décision

We have issued an Environmental Compliance Approval (air) to Stelco Inc., a manufacturer of integrated steel at a facility located at 2330 Haldimand Road 3, Haldimand, Ontario.

Approval is for a pilot project to use on-site blast furnance gas (BFG) and basic oxygen furance gas (BOF), for the production of hydrogen gas.

Emissions from the hydrogen plant operations to the atmosphere include carbon monoxide.

Commentaires reçus

Par l'entremise du registre

0

Par courriel

1

Par la poste

0
Consulter les commentaires soumis par l'entremise du registre

Effets de la consultation

Comments received were reviewed and, where appropriate, were considered in the ministry's decision whether or not to proceed with the proposal.

Comment summary

Concerns were raised regarding the level of contaminant air concentrations and noise impacts at off-site locations resulting from the operation of the proposed hydrogen plant.

Ministry’s response to comment

The Environmental Compliance Approval application demonstrated that air and noise emissions from the proposed hydrogen plant would result in negligible changes to off-site impacts. The primary air contaminant of concern emitted from the hydrogen plant is carbon monoxide, and off-site concentrations of carbon monoxide from site-wide operations are predicted to be well within applicable ministry limits.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

How to Appeal

Cet avis de décision peut être porté en appel. Vous avez jusqu’à 15 jours à partir du 26 septembre 2023 pour entamer le processus d’appel.

Veuillez lire les renseignements suivants attentivement pour en savoir plus sur le processus d’appel.

Comment interjeter appelClick to Expand Accordion

Start the process to appeal

If you’re an Ontario resident, you can start the process to appeal this instrument decision.

First, you’ll need to seek leave (i.e. get permission) from the relevant appellate body to appeal the decision.

If the appellate body grants leave, the appeal itself will follow.

Seek leave to appeal

To seek leave to appeal, you need to do these three things:

  1. prepare your application
  2. provide notice to the minister
  3. mail your application to three parties

1. Prepare your application

You’ll need to prepare an application. You may wish to include the following things in your application:

  1. A document that includes:
    • your name, phone number, fax number (if any), and/or email address
    • the ERO number and ministry reference number (located on this page)
    • a statement about whether you are a resident in Ontario
    • your interest in the decision, and any facts you want taken into account in deciding whether you have an interest in the decision
    • the parts of the instrument that you’re challenging
    • whether the decision could result in significant harm to the environment
    • the reason(s) why you believe that no reasonable person – having regard to the relevant law and to any government policies developed to guide decisions of that kind – could have made the decision
    • the grounds (facts) you’ll be using to appeal
    • the outcome you’d like to see
  2. A copy of the instrument (approval, permit, order) that you you are seeking leave to appeal. You’ll find this in the decision notice on the Environmental Registry
  3. Copies of all supporting documents, facts and evidence that you’ll be using to appeal
What is considered

The appeal body will consider the following two questions in deciding whether to grant you leave to appeal:

  1. is there is good reason to believe that no reasonable person, with respect to the relevant law and to any government policies developed to guide decisions of that kind, could have made the decision?
  2. could the decision you wish to appeal result in significant harm to the environment?

2. Provide your notice

You’ll need to provide notice to the Minister of the Environment, Conservation and Parks that you’re seeking leave to appeal.

In your notice, please include a brief description of the:

  • decision that you wish to appeal
  • grounds for granting leave to appeal

You can provide notice by email at minister.mecp@ontario.ca or by mail at:

College Park 5th Floor, 777 Bay St.
Toronto, ON
M7A 2J3

3. Mail your application

You’ll need to mail your application that you prepared in step #1 to each of these three parties:

  • appellate body
  • issuing authority (the ministry official who issued the instrument)
  • proponent (the company or individual to whom the instrument was issued)

Autorité compétente
Nancy Orpana
Manager, Air Approvals

Environmental Permissions Branch
135 St. Clair Avenue West
Toronto, ON
M4V 1P5
Canada

(613) 484-2675

Proponent(s)

Stelco Inc.
2330 Haldimand Road 3
Haldimand County, ON
N0A 1L0
Canada


Organe d’appel

Registrar, Ontario Land Tribunal
655 Bay Street, Suite 1500
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca

About the Ontario Land Tribunal


Inclure les éléments suivants:

Numéro du REO
019-7370
Numéro de référence du ministère
8923-CSJGL7

Il ne s'agit pas d'un avis juridique. Veuillez vous reporter à la Charte des droits environnementaux de 1993 pour connaître les exigences exactes prévues par la loi. Consultez un avocat si vous avez besoin d'aide avec le processus d'appel.

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis

Proposition initiale

Numéro du REO
019-7370
Numéro de référence du ministère
8923-CSJGL7
Type d'avis
Instrument
Loi
Environmental Protection Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Proposition affichée

Période de consultation

18 juillet 2023 - 1 septembre 2023 (45 days)

Détails de la proposition

This proposal is to amend Environmental Compliance Approval (air) No. 6325-54QQWV issued to Stelco Inc., a manufacturer of integrated steel at a facility located at 2330 Haldimand Road 3, Haldimand, Ontario.

This amendment is for a pilot project to use on-site blast furnance gas (BFG) and basic oxygen furance gas (BOF), for the production of hydrogen gas.

Emissions from the hydrogen plant operations to the atmosphere include carbon monoxide.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

Commentaire

La consultation est maintenant terminée.

Cette consultation a eu lieu 18 juillet 2023
au 1 septembre 2023

Communiquer avec nous

Contact