Millbank Sawmill Inc. - Environmental Compliance Approval (air)

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Environmental Compliance Approval (air)

Numéro du REO
019-6909
Numéro de référence du ministère
6608-CP9LAH
Type d'avis
Instrument
Loi
Environmental Protection Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Décision Mis à jour
Décision publiée
Période de consultation
Du 6 avril 2023 au 21 mai 2023 (45 jours) Fermé
Dernière mise à jour

Update Announcement

This proposal notice was updated on September 3rd, 2024 to advise the public that this file is still under active review. The ministry is reviewing the comments it has received to date. The original proposal date and comment period have not been altered.

Cette consultation a eu lieu :

du 6 avril 2023
au 21 mai 2023

Résumé de la décision

This approval is for a new Environmental Compliance Approval (air & noise) for Millbank Sawmill Inc. for the operation of a sawmill facility located in the township of Perth East, County of Perth, Ontario.

Détails de l'emplacement

Adresse du site

6870 Perth Road 121
Perth East, ON
Canada

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

Millbank Sawmill Inc.
6870 Perth Road 121
Perth East, ON
N0K 1L0
Canada

Détails de la décision

This approval is for a new Environmental Compliance Approval (air & noise) for Millbank Sawmill Inc. for the operation of a sawmill facility located in the township of Perth East, County of Perth, Ontario.

This approval includes all emission sources from the facility that exhaust to the atmosphere including de-barker-rosserhead, saw, and sawdust and chip collection and storage.

Contaminant emissions to the atmosphere include:

  • nitrogen oxides,
  • carbon monoxide, and
  • particulate matter

Commentaires reçus

Par l'entremise du registre

9

Par courriel

0

Par la poste

0
Consulter les commentaires soumis par l'entremise du registre

Effets de la consultation

Comments were consistent with concerns within the ministry and, as a result, terms and conditions were added. The applicant has demonstrated that when operated in accordance with this approval, the air and noise emissions from the approved equipment would be in compliance with this ministry’s applicable acts, regulations and guidelines, specifically, section 9 of the Environmental Protection Act, O. Reg. 419/05: Air Pollution: Local Air Quality and noise guidelines, including ministry air quality standards and guidelines.

In order to ensure ongoing compliance with applicable standards, the applicant is required to perform the following actions as Conditions of the ECA:

  • Implement and update, the proposed Best Management Practices Plan (BMPP) to control fugitive dust emissions as per MECP Technical Bulletin, summarizing the progress on the implementation of the BMPP for that year;
  • Source testing program to collect accurate data to ensure the emissions of the power generator set are below the applicable limits.
  • he sawmill sound levels are reported to be in compliance with the applicable daytime noise limit for rural areas. Therefore, it is not anticipated that an adverse effect will be caused by noise emissions from this facility. Furthermore, two conditions will be included in the upcoming Approval. The first condition will limit the operation of the sawmill equipment to the daytime hours from 7 a.m. to 7 p.m. The second condition is for an Acoustic Audit so that the actual noise emissions from the sawmill can be verified in the field by an Independent Acoustical Consultant. Vibration emissions from the sawmill equipment are not anticipated to exceed the applicable limits based on the actual setback distances from the sawmill equipment to the surrounding houses

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

How to Appeal

Cet avis de décision peut être porté en appel. Vous avez jusqu’à 15 jours à partir du 20 août 2024 pour entamer le processus d’appel.

Veuillez lire les renseignements suivants attentivement pour en savoir plus sur le processus d’appel.

Comment interjeter appelClick to Expand Accordion

Start the process to appeal

If you’re an Ontario resident, you can start the process to appeal this instrument decision.

First, you’ll need to seek leave (i.e. get permission) from the relevant appellate body to appeal the decision.

If the appellate body grants leave, the appeal itself will follow.

Seek leave to appeal

To seek leave to appeal, you need to do these three things:

  1. prepare your application
  2. provide notice to the minister
  3. mail your application to three parties

1. Prepare your application

You’ll need to prepare an application. You may wish to include the following things in your application:

  1. A document that includes:
    • your name, phone number, fax number (if any), and/or email address
    • the ERO number and ministry reference number (located on this page)
    • a statement about whether you are a resident in Ontario
    • your interest in the decision, and any facts you want taken into account in deciding whether you have an interest in the decision
    • the parts of the instrument that you’re challenging
    • whether the decision could result in significant harm to the environment
    • the reason(s) why you believe that no reasonable person – having regard to the relevant law and to any government policies developed to guide decisions of that kind – could have made the decision
    • the grounds (facts) you’ll be using to appeal
    • the outcome you’d like to see
  2. A copy of the instrument (approval, permit, order) that you you are seeking leave to appeal. You’ll find this in the decision notice on the Environmental Registry
  3. Copies of all supporting documents, facts and evidence that you’ll be using to appeal
What is considered

The appeal body will consider the following two questions in deciding whether to grant you leave to appeal:

  1. is there is good reason to believe that no reasonable person, with respect to the relevant law and to any government policies developed to guide decisions of that kind, could have made the decision?
  2. could the decision you wish to appeal result in significant harm to the environment?

2. Provide your notice

You’ll need to provide notice to the Minister of the Environment, Conservation and Parks that you’re seeking leave to appeal.

In your notice, please include a brief description of the:

  • decision that you wish to appeal
  • grounds for granting leave to appeal

You can provide notice by email at minister.mecp@ontario.ca or by mail at:

College Park 5th Floor, 777 Bay St.
Toronto, ON
M7A 2J3

3. Mail your application

You’ll need to mail your application that you prepared in step #1 to each of these three parties:

  • appellate body
  • issuing authority (the ministry official who issued the instrument)
  • proponent (the company or individual to whom the instrument was issued)


Proponent(s)

Millbank Sawmill Inc.
6870 Perth Road 121
Perth East, ON
N0K 1L0
Canada


Organe d’appel

Registrar, Ontario Land Tribunal
655 Bay Street, Suite 1500
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca

About the Ontario Land Tribunal


Inclure les éléments suivants:

Numéro du REO
019-6909
Numéro de référence du ministère
6608-CP9LAH

Il ne s'agit pas d'un avis juridique. Veuillez vous reporter à la Charte des droits environnementaux de 1993 pour connaître les exigences exactes prévues par la loi. Consultez un avocat si vous avez besoin d'aide avec le processus d'appel.

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis

Proposition initiale

Numéro du REO
019-6909
Numéro de référence du ministère
6608-CP9LAH
Type d'avis
Instrument
Loi
Environmental Protection Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Proposition affichée

Période de consultation

6 avril 2023 - 21 mai 2023 (45 days)

Détails de la proposition

This proposal is for a new Environmental Compliance Approval (air & noise) for Millbank Sawmill Inc. for the operation of a sawmill facility located in the township of Perth East, County of Perth, Ontario.

This application includes all emission sources from the facility that exhaust to the atmosphere including debarking and dropping of logs, cutting, saw, and sawdust and chip collection and storage.

Contaminant emissions to the atmosphere include:

  • nitrogen oxides
  • carbon monoxide
  • particulate matter

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

Commentaire

La consultation est maintenant terminée.

Cette consultation a eu lieu 6 avril 2023
au 21 mai 2023

Communiquer avec nous

Contact