Cette consultation a eu lieu :
du 21 mars 2023
au 20 avril 2023
Résumé de la proposition
George Benn & Sons Construction Limited seeks to authorize amendment to the current site plan to change the final depth of extraction from above the water table to below the water table for a Quarry located in the Township of Loyalist.
Détails de l'emplacement
Détails de l'emplacement du site
Township of Loyalist, Lennox and Addington County.
Part East Half of Lot 12, and Part West Half of lot 13, Concession 7, Geographic Township of Ernestown.
The site is located approximately 2.5 kilometres Southwest of Newburgh.
The site is ARA licence No. 2447.
A link to our mapping tool allows you to locate and view licensed sites under the ARA.
Promoteur(s)
George Benn & Sons Construction Limited
RR# 4
Napanee,
ON
K7R 3K9
Canada
Détails de la proposition
Application has been made by George Benn & Sons Construction Limited to amend the current site plan to allow extraction below water. This will deepen the existing licenced quarry by 12.2 metres with an average final floor elevation at 132 masl.
Public consultation opportunities
The proposal request for this licence is being circulated within the Ministry Natural Resources and Forestry. Additionally, notification of this application has been forwarded to the Township of Loyalist, Lennox and Addington County, Cataraqui Region Conservation Authorities, Ontario Ministry of Agriculture, Food and Rural Affairs and the Ministry of the Environment, Conservation and Parks for comment.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
300 Water Street, 4th Floor, South tower
Peterborough,
ON
K9J 3C7
Canada
Communiquer avec nous
Contact
Shane Stuart
300 Water Street, 4th Floor, South tower
Peterborough,
ON
K9J 3C7
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 21 mars 2023
au 20 avril 2023