Commentaire
According to an email from Darryl Hagman of the MNRF there have been no technical studies done on the Carmeuse sites because of “Grandfathering”. AS A CITIZEN, IF I WISH TO UPGRADE OR CHANGE MY HOUSE WIRING, I AM REQUIRED TO BRING EVERYTHING UP TO CODE. IF A COMPANY IS UPGRADING THEIR LICENSE IS THIS NOT A PRUDENT OPPORTUNITY FOR US TO ENSURE THAT THE PROPER TECHNICAL STUDIES ARE DONE TO PROTECT PUBLIC SAFETY ? IN ORDER TO AQUIRE A LICENSE, OTHER QUARRYS ARE REQUIRED TO DO A HOST OF TECHNICAL STUDIES !!! (WELL INTERFERENCE, FIELD SURVEYS, BEDROCK GEOLOGY, HYDROGEOLOGICAL, TO NAME A FEW). SHOULD THIS COMPANY NOT BE REQUIRED TO THIS AS WELL?
Soumis le 6 mai 2019 2:20 PM
Commentaire sur
Carmeuse Lime (Canada) Limited - Changes to the site plan for a pit or quarry
Numéro du REO
012-9850
Identifiant (ID) du commentaire
28268
Commentaire fait au nom
Statut du commentaire